REFERENCES 2008
TURBINES
Power Plant Rybnik S.A.
Major overhaul of turbogenerator 13K215 no 2 and 3
Power Plant Rybnik S.A.
Major overhaul of tubine fittings in units 2 and 4
Power Plant Rybnik S.A.
Major overhaul of pumps in unit 2,3 and 4
Power Plant Rybnik S.A.
Overhaul and revision by Technical Supervision Office (UDT) of high pressure regeneration exchangers and feed water tank in units 2,3 and 4
Power Plant Rybnik S.A.
Replacement of diffusers in high pressure control valves in unit 3 (executed with subcontractors)
Spółka Energetyczna "Jastrzębie" S.A.
Technical check-up of stand-by valve AZO in turbogenerator TC-32
Spółka Energetyczna "Jastrzębie" S.A.
Major overhaul of turbogenerator TC-32 no 2
Power Plant Rybnik S.A.
Disassembly and assembly of high and medium pressure valve chambers and reducing and dumping station valves in unit 3.
BOILERS
Foster Wheeler Energia Polska Sp. z o.o.
Sosnowiec Office
Manufacturing and delivery of pressure tanks for Deven Project
Power Plant Rybnik S.A.
Repair of pulverised coal burners and ducts, flue gas fans, rotary air heaters for boiler type OP650K no. 2
AUXILIARIES
Spółka Energetyczna "Jastrzębie" S.A.
Overhaul of overhead crane Q=30/5t in Moszczenica CHP
Spółka Energetyczna "Jastrzębie" S.A.
Overhaul of overhead crane Q=50/12,5t in Zofiowka CHP
POLIMEX-MOSTOSTAL S.A..
EC&I for FGD in ERSA
Huta Łabędy S.A.
Supply and replacement of 4 crane operator cabins in Łabędy steelworks
Power Plant Rybnik S.A.
Repair and maintenance of lifting equipment
|